Completed Projects
Conctruction Works and Provision of Construction Vehicles and Equipments
1. Irrigation of 3000 ha of Farmland in Yevlakh and Goranboy Region | Client: Azersheker LLC | Status: Completed
- Dn90-710mm HDPE Pipe Network: 38km
- Aluminum core armored electrical cables: 26 km
- Pump station: 1 complex (containing 9 nrs of 250-400/1320/W and 5 nrs of 300-350/1100/W pumps)
- Pivot pads: 39 units
2. Irrigation of 568 ha of Farmland in Yalama Agropark | Client: Yalama Agropark LLC | Status: Completed
- Dn125-400mm HDPE Pipe Network: 16km
- Aluminum core armored electrical cables: 14.6 km
- Pump station: 2 complexes (containing 8 nrs of 1D 315-71A pumps)
- Pivot pads: 19 units
3. Irrigation of 1019 ha of Farmland in Shamkir Region | Client: Azersheker LLC | Status: Completed
- Dn90-630mm HDPE Pipe Network: 23km
- Overhead power grid systems with AC70 cables including transformers installation: 38.7km (KTM 10/0.4, 63 kvA – 4 nrs, KTM 10/0.4, 40 kvA – 1 nr)
- Aluminum core armored electrical cables: 18.4 km
- Pump station: 1 complex (containing 4 nrs of NSCF Lowara 150-400 and 4 nrs of NSCF Lowara 200-400 pumps)
- Pivot pads: 23 units
4. Irrigation of 225 ha of Farmland in Samukh Region | Client: Agrodairy LLC | Status: Completed
- Dn200-450mm HDPE Pipe Network: 6km
- Underground power grid systems with 1x95/16 cables including transformer installation: 9.6km (KTM 35/0.4, 160 kvA – 1 nr)
- Aluminum core armored electrical cables: 9.2 km
- Pump station: 1 unit
- Pivot pads: 6 units
- Farmland internal roads (5th category): 3.1 km
5. Irrigation of 620 ha of Farmland in Yevlakh Agropark | Client: Azersheker LLC | Status: Completed
- Dn110-560mm HDPE Pipe Network: 8km
- Aluminum core armored electrical cables: 6.2 km
- Pivot pads: 10 units
6. Irrigation of 1283 ha of Farmland in Hadjigabul Region (PH1) | Client: Agrodairy LLC | Status: Completed
- Dn110-560mm HDPE Pipe Network: 21km
- Pivot pads: 19 units
7. Irrigation of 783 ha of Farmland in Hadjigabul Region (PH2) | Client: Agrodairy LLC | Status: Completed
- Dn110-560mm HDPE Pipe Network: 14km
- Pivot pads: 13 units
8. Construction of Farmland Internal Roads in Hadjigabul Region (H2) | Client: Agrodairy LLC | Status: Completed
- 5th Category Roads: 19km
9. Reconstruction of Overlflow chamber and repair of existing channel in Hadjigabul Region (H2) | Client: Agrodairy LLC | Status: Completed
- Reconstruction of Overflow chamber
- Repairing of existing channel
- Site clearing of existing channel
10. Renewal of Technical Park | Client: Nakhchivan Autonomous Republic Amelioration and Water Farm Company OJSC |
Status: Completed
- Wheeled excavator (22t): 1 nr
- Backhoe loaders (9t): 3 nrs
- Mini loaders: 2nrs
- Mini excavators (3.5t): 2nrs
- Mobile cranes (16t): 2nrs
- Combine Sewer Cleaning Vehicles: 1nr
- Welding generators(450A): 4nrs
- Double cab awning recovery autos: 8nrs
11. Restoration of the foundations of sieves and loading devices and concrete works in silos in Hadjigabul | Client: Agrodairy LLC | Status: Completed
- Reinforcement works in Sieves facility (including injection works)
- Reinforcement works in Loading facility (including injection works)
- Concrete works in Silos
12. Laboratory of Plant Breeding | Client: Ministry of Agriculture of the Republic of Azerbaijan | Status: Completed
- Supply and Installation of Plant Breeding Laboratory: 2 units